Prestaging

ITI can carry out your pre-staging requirements for network deployments in our onsite clean room.

Pre-staging can involve rack & stack, internal cab cabling and testing, or the loading of specific software components such as firmware upgrades to active equipment, prior to being deployed to site.

Pre-build, configuration and testing has many benefits to project roll outs, including:

  • Reduce onsite time by up to 50%
  • Reduce the cost of deployment
  • Reduce the time spent liaising with operations centres
  • Enables stability tests to be run prior to network migration
  • Improves quality of implementation
  • Enables accurate monitoring of equipment
  • Simplifies logistics

All your equipment can be stored in our fully secure warehouse and called off as you require. Once all prestaging is complete, our team will re-package the equipment and ship to a dedicated location of your choosing.

Contact us to find out more

This field is for validation purposes and should be left unchanged.

Sectors

Industrial

Security

MOD

Healthcare

Retail

Urban

Hospitality

Education

Energy

Transport